BondJamesBond
Blunt Instrument
- Joined
- Aug 21, 2008
- Messages
- 3,871
- Reaction score
- -12
Mods: Please give this a little time before merging.
Based on analysis of the ping records Casey traveled Dean Road going north out of JB Park during some critical time periods.
The street level view on Google shows what appears to be heavy construction on Dean Road north of JBP. However, it is unclear what the timing of this construction was or the extend of the construction, if any detours were involved, etc.
Understanding how this construction may've impacted Casey's travel on Dean Rd. could be an important factor in understanding some time she spent there, or, locations she may've been if she was stationary longer than one would expect...perhaps stopping for a reason.
Need help from some locals that could tell us if the construction was on-going around 6/16-7/15, if there were any detours what route they would've been, etc.
Thanks!
Based on analysis of the ping records Casey traveled Dean Road going north out of JB Park during some critical time periods.
The street level view on Google shows what appears to be heavy construction on Dean Road north of JBP. However, it is unclear what the timing of this construction was or the extend of the construction, if any detours were involved, etc.
Understanding how this construction may've impacted Casey's travel on Dean Rd. could be an important factor in understanding some time she spent there, or, locations she may've been if she was stationary longer than one would expect...perhaps stopping for a reason.
Need help from some locals that could tell us if the construction was on-going around 6/16-7/15, if there were any detours what route they would've been, etc.
Thanks!